KOREASCHOLAR

연구로 안전 해체를 위한 스케쥴링 최적화 Scheduling Optimization for Safety Decommissioning of Research Reactor

김태성, 박희성, 이종환, 장성호, 김상호
  • 언어KOR
  • URLhttp://db.koreascholar.com/Article/Detail/245342
대한안전경영과학회지
제8권 제3호 (2006.06)
pp.67-75
대한안전경영과학회 (Korea Safety Management & Science)
초록

Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

저자
  • 김태성 | Kim, Tae-Sung
  • 박희성 | Park, Hee-Seoung
  • 이종환 | Lee, Jong-Hwan
  • 장성호 | Chang, Sung-Ho
  • 김상호 | Kim, Sang-Ho