논문 상세보기

Cost Evaluation for Transport of the Decommissioning Waste of Kori 1 According to Transport Modes

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/430559
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

Radioactive waste generated during the decommissioning of Kori Unit 1 can be packaged in a transport container under development and transported to a disposal facility by sea transport or land transport. In this study, the cost of each transport method was evaluated by considering the methods of land transport, sea transport, and parallel transport of the radioactive waste dismantled at Kori Unit 1. In evaluating the shipping cost, the shipping cost was evaluated by assuming the construction of a new ship without considering shipping by CHEONG JEONG NURI, which is currently carrying operational waste. Since the cargo hold of CHEONG JEONG NURI was built to fit the existing operating waste transport container and is not suitable for transporting the transport container currently under development, sea transport using CHEONG JEONG NURI was excluded in this paper. In the case of on-road transportation, the final fare for each distance was calculated in accordance with the Enforcement Decree of the Freight Vehicle Transportation Business Act, and the cost of onroad transportation was evaluated by estimating the labor cost of the input manpower required for onroad transportation. The cost of on-road transportation was estimated to be approximately KRW 510 million, the product of the total number of transports 459 times the sum of the cost of transportation vehicle freight cost of about KRW 720,000 and the labor cost of input personnel of KRW 380,000. It is difficult to predict the cost of building a new ship at this point, as the cost of building new ship is determined by the cost of number of items such as ship design specifications and material prices, labor costs, and finance costs at the time of construction. Accordingly, considering the 2% annual inflation rate based on the shipbuilding cost (about KRW 26 billion) and financing cost (about KRW 12 billion) at the time of construction of the CHEONG JEONG NURI (2005 yr.), decommissioning of Kori Unit 1 (2025 yr.) construction cost finance cost was estimated and evaluated. According to the result of comparing the transport cost for each transport scenario, land transport is about 510 million won, which is advantageous in terms of economic feasibility compared to the sea transport scenario. However, when transporting by land, it is disadvantageous in terms of acceptability of residents because it is transported multiple times on general roads. The cost of building a new ship is about KRW 56.4 billion, which is disadvantageous in terms of the cost of transporting waste from the dismantling of Kori Unit 1. But, in the future, cost reduction can be expected if waste materials issued when dismantling nuclear power plants are transported.

저자
  • Sanghyeon Eom(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul)
  • Wooyong Kim(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul) Corresponding author
  • Moonoh Kim(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul) Corresponding author