논문 상세보기

Aspects to be Considered in the Development of the Decommissioning Process of Nuclear Power Plants

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/431053
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

The domestic Nuclear Power Plant (NPP) decommissioning project is expected to be carried out sequentially, starting with Kori Unit 1. As a license holder, in order to smoothly operate a new decommissioning project, a process in terms of project management must be well established. Therefore, this study will discuss what factors should be considered in establishing the process of decommissioning NPPs. Various standards have been proposed as project management tools on how to express the business process in writing and in what aspects to describe it. Representatively, PMBOK, ISO 21500, and PRICE 2 may be considered. It will be necessary to consider IAEA safety standards in the nuclear decommissioning project. GSR part 6 and part 2 can be considered as two major requirements. GSR part 6 presents a total of 15 requirements, including decommissioning plans, general safety requirements until execution and termination. GSR part 2 presents basic principles for securing the safety of nuclear facilities, and there are a total of 14 requirements. Domestic regulatory guidelines should be considered, and there will be largely laws and regulations related to the decommissioning of nuclear facilities, guidelines for regulatory agencies, and guidelines and regulations related to HSE. The Nuclear Safety Act, Enforcement Decree, Enforcement Rules, and NSSC should be considered in the applicable law for nuclear facilities. Since the construction and operation process has been established for domestic decommissioning project, there will be parts where existing procedures must be applied in terms of life cycle management of facilities and the same performance entity. As a management areas classification in the construction and operation stage, it seems that a classification similar to Level 1 and Level 2 should be applied to the decommissioning project. This study analyzed the factors to be considered in the management system in preparing for the first decommissioning project in Korea. Since it is project management, it is necessary to establish a system by referring to international standards, and it is suggested that domestic regulatory reflection, existing business procedures, and domestic business conditions should be considered.

저자
  • Gi-Lim Kim(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Ji-Hwan Yu(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Hyung-Woo Seo(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI)) Corresponding author