한국구조물진단유지관리공학회 학술발표대회 논문집 2018 한국구조물진단유지관리공학회 봄 학술발표 및 포럼 논문집 (p.183-186)

|구조성능_구두발표|
BIM기반의 건축 수량산출정보 구축에 관한 연구

A Study on Architectural Quantity take-off Based on BIM

목차

Abstract
1. 서 론
2. BIM기반 수량산출정보 구축
  2.1 BIM기반 수량산출정보 구축
  2.2 3D모델 객체 제원을 활용한 수량산출
  2.3 3D모델 객체가 없는 비 형상요소 수량산출
  2.4 소결
3. BIM기반 산출정보 활용사례
4. 결 론

초록

BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. This is a confergence of geometric information and attribute information, and BIM requires convergence in the construction work process. This study aims to present a method for activating BIM in Project management. The first task after the design is quantity take-off. The QTO is a process of converting the geometric information (Analog) into the attribute information (Digital). This QTO-database is important information that can be based on Project management. Therefore, it is necessary to construct information that is useful from QTO. It is WBS-CBS integrated information. BIM-based QTO refers to linkage between 3D model object and WBS-CBS. Through this study, we show the method of WBS-CBS integrated information based on BIM and show the applicability of BIM through actual case. This study is expected to be a basis for the successful implementation of BIM-based project management.