검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 171

        21.
        2014.11 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        5,700원
        23.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As preventive measures have received tremendous attention to prevent any possible accident in advance, many work places have introduced safety and health management systems. However despite of this government's effort, the industrial accident rate of small-scale businesses with less than 50 employees does not decline, which is mainly because the projects are not differentiated according to the risk level of individual business. To evaluate the risk level of small-scale businesses with less than 50 employees and then establish effective safety and health management systems according to the risk level, this study has conducted the following processes. The small-scale businesses with less than 50 employees were evaluated through accident type, and potential accident risk factor was evaluated through location, business type, and business size. The results of this analysis are expected to make contribution to improving the effectiveness of the safety and health management supports to small-scale businesses with less than 50 employees.
        4,000원
        24.
        2014.04 구독 인증기관 무료, 개인회원 유료
        건설현장에서 조적, 미장, 방수, 타일 등 습식공사는 대부분의 작업들이 인력에 의해 공사가 이루어지고 있다. 공사를 위해 다뤄지는 자재들도 인력에 의해 운반 및 시공되 는 경우가 많아 작업자들은 여러 가지 안전사고의 위험에 노출된다. 안전한 작업환경 을 만들기 위해서는 작업공정을 단순화 하고 사용하는 자재와 장비도 경량화하여야 한다. 특히 벽돌과 콘크리트 블록 쌓기와 같은 조적공사시 사용하는 철근콘크리트 인 방보는 중량이 무겁고, 현장에서 제작시 시간도 많이 소요된다. 따라서 이번 연구를 통하여 무거운 콘크리트 인방보 대신 벽돌을 압축재로 사용할 수 있는 합성구조 인방 보 형상을 연구함으로써 가볍고 경제적인 강재인방보 구조형상을 제시하고자 한다.
        4,800원
        25.
        2014.04 구독 인증기관 무료, 개인회원 유료
        산업화의 발달과 각종 사고의 증가, 심질환 등 응급의료와 관련있는 질환의 사망률 등이 높아짐에 따라 국가 응급의료서비스의 필요성과 중요성이 더욱 더 부각되어 이 에 대한 문헌연구와 질과 관련된 선행연구에서 논의된 핵심요인들을 국내병원 전단계 인 소방응급의료서비스에 대한 서비스 강화를 위한 평가요인으로 도출, 이를 AHP기법 을 활용하여 평가요인들에 대한 중요도 및 우선순위를 분석하여 분석결과를 기반으로 소방응급의료서비스에서 중점을 두어야 하는 요인과 요인에 대한 우선순위를 제시함 으로써 소방응급의료서비스의 질적 향상을 도모하고자 한다.
        4,200원
        28.
        2014.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Prevention of the disasters is the best welfare to workers and it brings the growth and stability of an enterprise, finally uplifts the national competitiveness. Because small-scale businesses do not have safety and health managers, the government provides a wide range of safety and health management supports to small-scale businesses. However despite of this government's effort, the industrial accident rate of small-scale businesses does not decline, which is mainly because the projects are not differentiated according to the risk level of individual business. Therefore, this paper aims to obtain implications concerning a plan to conduct a reliable assessment of education through a safety job assessment, and to build a framework which may improve a technical area through the AHP analysis.
        4,000원
        32.
        2013.11 구독 인증기관 무료, 개인회원 유료
        비용편익분석은 어떤 사업으로 인하여 자연배분의 변화가 생길 때 그에 따른 경제적 편익을 측정하게 되며 사업을 시행하여 생기는 편익과 비용을 비교하여 경제성을 평가하고 대안 중에서 우선순위를 결정할 때 유용하다. 따라서, 본 논문은 자본에 관한 투자기준을 마련하기 위해서 분석용 모델인 “비용편익분석”을 활용 하여 제조기업의 어떤 사업계획에 의하여 생겨나는 자본요소가 어떻게 투자되어야 생산비용을 최소화 할 수 있는지를 자본투자에서 가장 핵심적인 생산설비 투자와 기술개발투자 에 대한 비용편익분석을 통하여 그 방법론을 제시함으로써, 자본투자에 있어서 “비용효과분석”의 활용성을 확인하고자 한다.
        4,000원
        33.
        2013.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As people make efforts on accident prevention, the number of accidents has decreased over the years, however the number of fatal major industry accidents has rather increased, which resulted in the increase of the number of deaths in total. Under these conditions, there is an attempt to introduce and perform the safety vocational education system as a means for preventing major industry accidents. Therefore, in this paper, we analyse vocational education of manufacturing industry from the safety's point of view and suggest the efficient techniques measuring and managing each safety management. Proposed techniques show that the specification on safety determines weight through the managers of firms and each process is suggested by using SN ratio.
        4,000원
        35.
        2013.04 구독 인증기관 무료, 개인회원 유료
        실리콘 기반의 반도체 산업은 Moore Rule에 따른 집적도 향상에 힘입어 눈부시게 발전해 왔다. 그러나, 최근 최소 선 폭 수준이 10nm에 다다르면서 공정의 난이도는 한계에 다다랐으며, 한계를 극복하기 위해서는 폭발적인 비용 투입만으로도 확신할 수 없기 때문에 선 폭 미세화 (Scaling Down)를 통한 집적도 향상은 더 이상 비용/성능 측면에 효율적이지 못하다. 이러한 상황으로 인해 반도체 업체들은 한계를 극복하기 위한 여러 가지 방법을 강구하고 있는 실정이다. 이러한 (개발 난이도 증가, 소형화, 경량화, 고집적화에 대한 고객 요구 증대) 한계를 해결하기 위하여, 크게 3가지 관점에서 지속적으로 연구가 이루어 지고 있다. 여기서는 현재 가장 활발한 연구가 이루어지고 있으며, 가장 대응이 용이한 PKG 신기술 개발에 대하여 다루고자 한다.
        4,000원
        36.
        2013.04 구독 인증기관 무료, 개인회원 유료
        As people make efforts on accident prevention, the number of accidents is decreasing, fatal major industry accidents are rather than increasing so that the number of deaths has not decreased. Under these conditions, there is an attempt to introduce and perform the safety vacational education system as a means for keeping from major industry accidents. Therefore, in this paper, we analysis vacational education of manufacturing industry in safety point of view and suggest the technique efficiently measuring and managing each safety management. Proposed the technique shows that the specification on safety determines weight through the managers of firms and each process is suggested by using SN Ratio.
        4,000원
        37.
        2013.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Domestic semiconductor industry grew rapidly enough to draw a close attention in a short period less than twenty years. Korea grew to be the third largest semiconductor manufacturing country in the world during the period and has maintained the proud of Koreans even in technological competitiveness. Accordingly, In this study, it was introduced and analyzed 6 sigma method using profits making analysis for increasing Productivity in the semiconductor manufacturing process.
        4,000원
        39.
        2012.11 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 사회, 경제, 교육, 제도 등의 변화 분석을 통해 세계화와 미래화를 위 한 노동시장의 변화에 대해 예측하고 미래 산업의 효율적 운영 관리방안 마련 및 시 스템적 접근방법을 통한 무한 경쟁체제의 경쟁력 강화 방안 마련하고자 한다. 본 연구 에서 제시하는 산업분석에 대한 계산은 근거와 신뢰성에 대한 의견이 제시될 수 있으 나 본 연구에서 고려하고자 한 것은 산업 간의 포지셔닝 계수라는 것을 언급하고자 한다. 결국 포터가 제시한 방법론을 적용은 각 산업 간의 포지셔닝 결정을 위한 상대 적 가치 계산이지 산업에 절대적 계산이 아니다.
        4,000원
        40.
        2012.11 구독 인증기관 무료, 개인회원 유료
        본 연구는 통계청(2009-2010)의 국가 산업 표준을 기본으로 생애주기를 고려한다. 생애주기에 대한 변수는 경제활동인구와 사업체 동향을 분석하여 실시하며 이에 따른 자격은 산업과 직업에 관련하여 해당하는 자격의 매칭 테이블을 기준으로 그 자격의 가치를 평가하는 방법을 선택하였다. 산업에 대한 분석은 일반적으로 활용되고 있는 경영기법에 따라 그 절차를 수용하고 관련변수를 응용 또는 적용하도록 하였다.
        4,000원
        1 2 3 4 5