검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 8

        1.
        2021.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In supply chain, there are a variety of different uncertainties including demand, service time, lead time, and so forth. The uncertainty of demand has been commonly studied by researchers or practitioners in the field of supply chain. However, the uncertainty of upstream supply chain has also increased. A problem of uncertainty in the upstream supply chain is the fluctuation of the lead time. The stochastic lead time sometimes causes to happen so called the order crossover which is not the same sequences of the order placed and the order arrived. When the order crossover happens, ordinary inventory policies have difficult to find the optimal inventory solutions. In this research, we investigate the lead time distribution in case of the order crossover and explore the resolutions of the inventory solution with the order crossover.
        4,000원
        2.
        2021.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        During the shift from gasoline vehicles to electric ones, auto parts manufacturing companies have realized the importance of improvement in the manufacturing process that does not require any layout changes nor extra investments, while maintaining their current production rate. Due to these reasons, for the auto part manufacturing company, I-company, this study has developed the simulation model of the PUSH system to conduct a process analysis in terms of production rate, WIP level, and logistics work’s utilization rate. In addition, this study compares the PUSH system with other three manufacturing systems -KANBAN, DBR, and CONWIP- to compare the performance of these production systems, while satisfying the company’s target production rate. With respect to lead-time, the simulation results show that the improvement of 77.90% for the KANBAN system, 40.39% for the CONWIP system, and 69.81% for the DBR system compared to the PUSH system. In addition, with respect to WIP level, the experimental results demonstrate that the improvement of 77.91% for the KANBAN system, 40.41% for the CONWIP system, and 69.82% for the DBR system compared to the PUSH system. Since the KANBAN system has the largest impacts on the reduction of the lead-time and WIP level compared to other production systems, this study recommends the KANBAN system as the proper manufacturing system of the target company. This study also shows that the proper size of moving units is four and the priority allocation of bottleneck process methods improves the target company’s WIP and lead-time. Based on the results of this study, the adoption of the KANBAN system will significantly improve the production process of the target company in terms of lead-time and WIP level.
        4,500원
        3.
        2018.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study suggests a model of production information system that can reduce manufacturing lead time and uniformize quality by using DNC S/W as a part of constructing production information management system in the industrial field of the existing marine engine block manufacturing companies. Under the effect of development of this system, the NC machine interface device can be installed in the control computer to obtain the quality information of the workpiece in real time so that the time to inspect the process quality and verify the product defect information can be reduced by more than 70%. In addition, the reliability of quality information has been improved and the external credibility has been improved. It took 30 minutes for operator to obtain, analyze and manage the quality information when the existing USB memory is used, but the communication between the NC controller computer and the NC controller in real time was completed to analyze the workpiece within 10 seconds.
        4,000원
        5.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper is concerned with the single vendor single buyer integrated production inventory problem. To make this problem more practical, space restriction and lead time proportional to lot size are considered. Since the space for the inventory is limited in most practical inventory system, the space restriction for the inventory of a vendor and a buyer is considered. As product’s quantity to be manufactured by the vendor is increased, the lead time for the order is usually increased. Therefore, lead time for the product is proportional to the order quantity by the buyer. Demand is assumed to be stochastic and the continuous review inventory policy is used by the buyer. If the buyer places an order, then the vendor will start to manufacture products and the products will be transferred to the buyer with equal shipments many times. The mathematical formulation with space restriction for the inventory of a vendor and a buyer is suggested in this paper. This problem is constrained nonlinear integer programming problem. Order quantity, reorder points for the buyer, and the number of shipments are required to be determined. A Lagrangian relaxation approach, a popular solution method for constrained problem, is developed to find lower bound of this problem. Since a Lagrangian relaxation approach cannot guarantee the feasible solution, the solution method based on the Lagrangian relaxation approach is proposed to provide with a good feasible solution. Total costs by the proposed method are pretty close to those by the Lagrangian relaxation approach. Sensitivity analysis for space restriction for the vendor and the buyer is done to figure out the relationships between parameters.
        4,000원
        6.
        2015.10 구독 인증기관 무료, 개인회원 유료
        The single vendor single buyer integrated production inventory problem with lead time proportional to lot size and space restriction is studied. Demand is assumed to be stochastic and the continuous review inventory policy is used for the buyer. If the buyer places an order with lots of products, then the vendor will produce lots of products and the products will be transferred to the buyer with equal shipments many times. Mathematical model for this problem is defined and a Lagrangian relaxation approach is developed.
        3,000원
        7.
        2013.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As customers' demands for diversified small-quantity products have been increased, there have been great efforts for a firm to respond to customers' demands flexibly and minimize the cost of inventory at the same time. To achieve that goal, in SCM perspective, many firms have tried to control the inventory efficiently. We present an mathematical model to determine the near optimal (s, S) policy of the supply chain, composed of multi suppliers, a warehouse and multi retailers. (s, S) policy is to order the quantity up to target inventory level when inventory level falls below the reorder point. But it is difficult to analyze inventory level because it is varied with stochastic demand of customers. To reflect stochastic demand of customers in our model, we do the analyses in the following order. First, the analysis of inventory in retailers is done at the mathematical model that we present. Then, the analysis of demand pattern in a warehouse is performed as the inventory of a warehouse is much effected by retailers' order. After that, the analysis of inventory in a warehouse is followed. Finally, the integrated mathematical model is presented. It is not easy to get the solution of the mathematical model, because it includes many stochastic factors. Thus, we get the solutions after the stochastic demand is approximated, then they are verified by the simulations.
        4,500원
        8.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
          Ultra-high voltage transformer industry has characteristic of small quantity batch production system by other order processing unlike general mass production systems. In this industry, observance of time deadline is very important in market competitive
        4,000원