검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2020.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This study is a method for developing a 3D stratum modeling that uses Civil3D, CAD, Revit, and Dynamo, the products of Autodesk and ground survey data to prevent reversal and applying BIM design to underground structures. METHODS : If the ground level difference is severe and the survey data is not sufficiently spaced, a reversal phenomenon occurs such that the stratum is generated above the surface ground. In such cases, the first layer of the stratum can be offset from the ground surface and the remaining layers are created and utilized by the stratum thickness. However, the first layer is just offset from the ground surface, which is not an accurate implementation of geological information. To fix this error, we propose a method to calculate the quantity in 3D based on the algorithm that generates the stratum underneath the original ground surface connected with borehole data. RESULTS : The 3D stratum is designed to be implemented within 30 min with minimum memory resource occupancy. The ground surface is generally based on a digital map and can be linked with a drone and 3D scan data afterwards. The stratum model for each layer can be implemented in both a triangulated irregular network (TIN) and solid for quantity and volume calculations. Each layer will be generated in selected colors, and analysis on altitude, gradients, etc. can be performed with it. CONCLUSIONS : Constructing 3D spatial information using 2D information is expected to lay the foundation for providing required services in construction, real estate, architecture, urban planning, and transportation in the future, to users with integration and convergence into various fields such as BIM, smart city, digital twin, and VR-AR.
        4,000원
        2.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출·견적 지침 및 기준을 분석하며, 기존 견 적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리 트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과 물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽 을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁 극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여 할 것으로 기대한다.
        4,000원
        3.
        2018.04 서비스 종료(열람 제한)
        BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. This is a confergence of geometric information and attribute information, and BIM requires convergence in the construction work process. This study aims to present a method for activating BIM in Project management. The first task after the design is quantity take-off. The QTO is a process of converting the geometric information (Analog) into the attribute information (Digital). This QTO-database is important information that can be based on Project management. Therefore, it is necessary to construct information that is useful from QTO. It is WBS-CBS integrated information. BIM-based QTO refers to linkage between 3D model object and WBS-CBS. Through this study, we show the method of WBS-CBS integrated information based on BIM and show the applicability of BIM through actual case. This study is expected to be a basis for the successful implementation of BIM-based project management.
        4.
        2004.06 KCI 등재 서비스 종료(열람 제한)
        lndoor landscape plays important roles in the environmental improvements of inner building and play leading roles in offering green space to urban communities. as proffessionally part of technically construction, constucting indoor landscape, we have to frame the standard of materials and the standard of materials and the construction expanses because the demand of indoor landscape have risen increasingly. Especially, indoor landscape have kept in being paltry and unproffesionalty under the present condition of no standards about the estimation of proper construction expenses, Also, when Unit Cost chart is made, there are no indicators or specific standards that evaluate unit price. So this study carried out to suggest the evaluating standards of plantings pen some areas. It can be the basis work of the making out the proper constructional expenes The progresses and details of this study were the followings -first, the list of indoor plants and the standard of planter were suggested, through case study of indoor landscape and blue-drawings. -second, the quantity of planting materials according to each standardized planter was suggested through the theoretical and numeric methods, the existed unit cost charts and survey of several indoor landscapes -third, the quantity of typical planting materials according to each standized planter was also suggested. The result of this study were the followings. -the quantities per unit area of indoor ground cover flowing plants were 176/ m' in case of 3 chi planter of the type of upper growing, 127 I m' in case of 3 chi planter of the type of side growing. They were 94/ m2, 51/ m2, 38/ m2, 28/ m2 in order 4 chi, 5 chi, 7 chi, 7 chi planter of type of upper growing. Also they were found out 67/m2, 32/ m2, 24/ m2, 18/ m2 in order 4, 5, 6, and ?chi planter of the type of side growing. This study have several limits suggesting only the quantity of plants per unit area, to make out unit cost. llereafter this study will be developed to suggest the unit standard and unit cost of the other materials besides planting materials in indoor landscape. And the labor cost per unit materials will be developed through the next studies on the basis of the result of this study.