검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 116

        41.
        2015.11 구독 인증기관 무료, 개인회원 유료
        Currently, the construction industry in Korea implements the risk assessment that is implemented by managers and working team leaders. However, it is difficult to share the result of risk assessment meeting to substructural workers in korea system and the workers don't understand meaning and effect about risk assessment. The risk assessment is that the workers in the construction site have to know risk factors and reducing ways to the risks. But, the education and sharing methods for risk assessment system is insufficient in korea. For this risk assessment problems identified were surveyed. In order to improve the problems of the risk assessment, proposes the following three methods. First, Implement to educate the risk assessment during the basic safety and health training of construction industry. Second, the training way about workers' participation in risk assessment is necessary. For example, after watching videos, etc, the workers create risk assessment in person and make a presentation about it. Third, the risk assessment utilize during TBM(Tool Box Meeting). Before working every day, we need to educate risk factors and the reducing ways to the risk during TBM.
        4,800원
        42.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient basе and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.
        4,000원
        43.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.
        4,000원
        44.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total industrial accident rate in Korea is facing a record 0.7% for 10 years since 2000. After entering the continuous versus 0.6% (0.69%) in 2010. In 2011, the decrease was reduced to 0.65%. Conversely In contrast to foreign workers' share has increased dramatically over 10 years since 2000 to 2010 are expected to be difficult in the accident rate of 0.5% for the entry. Despite the ongoing disaster reduction efforts to reduce disaster (share) of foreign workers has been increasing rapidly Survey, Whilst the provision of disaster prevention system status and problem analysis and identify measures that can be established through such disaster reduction measures are urgently needed.
        4,200원
        45.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Share of total accidents in construction accidents construction site accident 70% of small embroidery Reducing the rate of Construction of the entire construction accidents decreased overall is a very meaningful work. Disaster reduction continues to increase despite the efforts of a small construction site(Amount less than 2,000,000,000) for Disaster Reduction In order to identify more clearly the cause of the system and provide the urgently needed measures.
        4,200원
        46.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The occupational health and safety accidents were continuously increased during handling, usage and manufacturing the chemical materials according to increase of small and medium sized enterprises in domestic industries. These accidents mainly resulted from insufficient occupational health and safety management and deteriorative facilities and focused on corresponding operation to minimize the damage of accidents after occurrence. But, it was required that we grasped the occurrence causes of occupational health and safety risk in handling, usage and manufacturing the chemical materials and develop the adequate corresponding operation and system according to the possible occurrence of occupational health and safety risk. This study deals with the development of risk assessment model to derive the risk and important risk of occupational health and safety and then help to construct the self-controlled occupational health and safety system for small and medium sized enterprises handling the chemical materials.
        4,000원
        47.
        2014.11 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        5,700원
        49.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Subcontracting business than the contracting business in shipbuilding industry is a lot of hazardous job and highly accident because of highly work intensity. In order to prevent the accidents, there is a need to analyze characteristic. of shipbuilding, to apply measures of risk assessment. In this paper, I suggested an improvement of the risk assessment through the actual condition research in shipbuilding industry. In the research method, I analysed accidents occurred until 2011-2013. Carried out the actual site survey while two weeks in May 2014. As a result, 1) The main pattern were caught-in or between, fall on the high level according to analyzed accidents. 2) To apply the weight show clear of magnitude for risk assessment. 3) Risk estimation of risk assessment is desirable to be quantization by accidents analysis, and to be greater than or equal to 4 steps.
        4,000원
        50.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        4,600원
        51.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As preventive measures have received tremendous attention to prevent any possible accident in advance, many work places have introduced safety and health management systems. However despite of this government's effort, the industrial accident rate of small-scale businesses with less than 50 employees does not decline, which is mainly because the projects are not differentiated according to the risk level of individual business. To evaluate the risk level of small-scale businesses with less than 50 employees and then establish effective safety and health management systems according to the risk level, this study has conducted the following processes. The small-scale businesses with less than 50 employees were evaluated through accident type, and potential accident risk factor was evaluated through location, business type, and business size. The results of this analysis are expected to make contribution to improving the effectiveness of the safety and health management supports to small-scale businesses with less than 50 employees.
        4,000원
        53.
        2014.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study was conducted to evaluate the health risk of workers exposed to phenyl glycidyl ether to prevent themfrom developing occupational diseases. The workplaces that coat floor with epoxy were selected and the sampleswere collected and analyzed with NIOSH 1619 Method. Unit risk was calculated according to the animalcarcinogenicity study. Excess cancer risk was also calculated by multiplying unit risk by exposure concentration.Monte Carlo simulation was performed to calculate the median, cumulative 90%, and cumulative 95% value.Phenyl glycidyl ether is a skin, eye irritator and can result in allergic reaction, nausea, intoxication. Unit risk wascalculated as 0.04 (mg/m³)-¹ based on the tumor incidence in rats. Geometric mean and geometric standarddeviation was also calculated as 0.112 ppm and 0.223, respectively by the workplace environment measurements.The median, cumulative 90%, and cumulative 95% value of excess cancer risk were calculated as 0.0244, 0.1328,0.1596, respectively. Not only cumulative 90% and cumulative 95% value but also the median of excess cancerrisk is much higher than 1×10-⁴ by the risk characterization, so there is a possibility of carcinogenesis to workers.Therefore, supervisors or managers of each workplace have to keep doing the risk management of their workplacesfor workers to reduce exposure to phenyl glycidyl ether.
        4,000원
        56.
        2013.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        구제역 바이러스는 소나 돼지 등의 우제류 가축에 경구 또는 흡입 노출 등의 다양한 노출 경로를 통해 심각한 감염성을 유발하는 생물학적 유해인자로 국내 축산업 운영에 있어 막대한 경제적 손실을 초래하는 병원균들 중 하나다. 구제역 발병에 대한 사전적 예방 관리를 도모할 수 있는 조치 방안 중 하나는 공기를 통해 전파되는 구제역 바이러스 확산에 대해 수학적 모델 적용을 통해 예측된 분석 결과에 따라 설정될 수 있다. 대기 확산 모델들은 일반적으로 구제역 바이러스의 주요 전파 경로인 경구 및 접촉 감염의 노출 시나리오를 예측할 수는 없으나, 상대적으로 예측도가 높은 대기 확산 모델의 경우 공기 전파에 대한 구제역 바이러스의 위해성 관리 방안을 결정하는 데 주요 역할을 담당할 수 있는 유용가능한 수단으로 여러 나라에서 활용되어 왔다. 구제역 바이러스 전파를 억제하기 위한 엄격한 관리 방안 중 다량의 가축 살처분 방법은 축산 농가들에게 심각한 경제적 손실을 초래하여 심각한 경우 새로운 자립의 여건마저도 상실시킬 수도 있다. 반면 낮은 수준의 대응 방안은 향후 구제역 발생에 따른 추가적 피해를 근원적으로 억제할 수 없는 역학적 한계에 봉착할 수 있다. 본 연구는 구제역 바이러스의 기본 특성 및 발생 모델 적용에 따른 공기 중 전파의 감염 위험성 평가 관련 선행 문헌들을 고찰하였다. 또한 1970년대 이후 구제역 바이러스의 공기 전파 경로를 예측하기 위해 여러 나라에서 실제 활용된 다양한 대기 확산 모델들의 적용 사례 및 장/단점을 비교 분석하였다.
        4,200원
        57.
        2013.04 구독 인증기관 무료, 개인회원 유료
        According to Department of labor guideline “2012-104 (2012.9.26.)” This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.
        4,300원
        58.
        2013.04 구독 인증기관 무료, 개인회원 유료
        This study compared the disasters in construction field under construction amount of 300,000,000 won and the whole construction fields in order to improve the efficacy of various industrial safety and health policies and services and examined the characteristics of disasters in construction field under 300,000,000 won. It also examined, compared and analyzed the characteristics of disaster in construction field under construction amount of 300,000,000 won that disaster prevention technical experts saw. The subjects of comparison were selected with statistical data of disaster for 2011 and those of disaster in construction field under construction amount of 300,000,000 won from January to August of 2012. And questionnaire was conducted with technical instruction experts of small-sized construction field and priority was drawn, compared and analyzed with AHP. Consequently, the results of different views between actual disaster data and experts' views were obtained. Therefore, this study suggested the characteristics of disaster in construction field under construction amount of 300,000,000 won and presented the methods for improving disaster prevention technical experts.
        4,000원
        60.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.
        4,000원
        1 2 3 4 5