검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2019.04 KCI 등재 서비스 종료(열람 제한)
        BAT-AEL(Best Available Techniques Associate Emission Level) is the basis for establishing permissible emission standards for the workplace. Therefore, it is necessary to formulate a regulated BAT-AEL setting methodology that is generally applicable to all relevant industries. For the BAT-AEL settings, various factors should be considered such as the pollutants item, whether the workplace is subject to integrated pollution prevention and control, whether BAT is applicable, the basic data type, the emission classification system, and the suitability of the collected data. Among these factors, it is the most important factor to establish the classification system for the emitting facilities such that the emission characteristics of an industrial facility and its pollutants can be effectively reflected. Furthermore the target of the survey workplace should adhere to the BAT guidelines, even if it is a workplace that is subject to an the integrated environmental system. Certified data (SEMS, TMS, cleanSYS, WEMS, etc.) can be used to prioritize the classification system for the emission facility and the emission levels of pollutants. However, the self-measured data, daily logs, and questionnaire data from the workplace can also be used upon agreement of the relevant TWG. The collected data should only be used only when the facility is operating normally. Data that have been determined to be outliers or inappropriate validation methods should also be excluded. The BAT-AEL can be establish by adhering to the following procedure: 1) investigate all relevant workplaces with in the industry, 2)select workplaces for integrated management, 3)Identify BAT application, 4)identify whether BAT is generally applicable, 5)establish a classification system for emitting facilities, 6)collection available data, 7)verify conformity, 8)remove of outliers, 9)prepare the BAT-AEL draft, 10)deliberate, and 11) perform the confirmation procedure.