검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, environmental new feeding and management system that are suitable for hot and cool water supply and floor heating system was developed and analyzed the effect for productivity and meat quality with supplying hot water in winter, the results were as follow as. HWSS was not affecting improvement with broiler productivity in initial time. Supplying hot water made the temperature inside broiler barn not go down rapidly as time went by from former term to latter term and continuous supplying hot water made boiler be adapted properly to the temperature and humidity of breeding environment that was requiring at its own growth phases. With unsaturated fatty acid / saturated fatty acids, HWSS was higher in broiler breast but CWSS was higher in the leg. With AST, ALT in blood, HWSS is higher than CWSS but with neutral lipid, protein, glucose, albumin, cholesterol, HWSS is higher than CWSS. Water circulation heating system gave an impact on meat quality and PH showed a higher in CWSS system. Also, redness and yellowness of the meat color was confirmed to be greater in HWSS. It was proved that the temperature difference of drinking water affected farm productivity, the blood and flesh quality, therefore, that could be estimated to be utilized successfully, if that should be used appropriately for productivity improvement according to the week-old of growth phase.
        4,000원
        2.
        2016.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The aim of these studies are to provide a basic data for the development of high-efficiency environmental improvement system that can parallel the cage(henhouse) and hot and cold potable water supply for increased summer heat stress relief and winter feed efficiency by optimal design. The cage area is 273m2. The air-to-water heat pump with 20RT capacity was used for heating and cooling. The control was used as an electric hot water boiler. For calculating heating load determined the cage size, materials, heat pump capacity, heating capacity, heat storage tank, and drinking water tank capacity etc. Therefore the capacity of heat pump was set-up using 20RT. The cage was built as a prefabricated panels henhouse of 13×21×4.5 m (width×depth×height). The heat storage tank and was drinking water tank capacity was constructed 3tons and 10 tons, respectively. In future, it is thought that optimal design considering the cage size and hen breeding scale is required.
        4,000원