검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 15

        1.
        2023.05 구독 인증기관·개인회원 무료
        Gamma imaging devices that can accurately localize the radioactive contamination could be effectively used during nuclear decommissioning or radioactive waste management. While several hand-held devices have been proposed, their low efficiency due to small sensors have severely limited their application. To overcome this limitation, a high-speed gamma imaging system is under development which comprises two quad-type detectors and a tungsten coded aperture mask. Each quad-type detector consists of four rectangular NaI(Tl) crystals with dimensions of 146×146 mm2 and 72 square-type photomultiplier tubes (PMTs). The detectors are placed in front and back to serve as scatter and absorber, respectively, for Compton imaging. In addition, a coded aperture mask was fabricated in rank 19 modified uniformly redundant array pattern and placed in front of the scatter for coded aperture imaging. The system offers several advanced features including 1) high efficiency achieved by employing large-area NaI(Tl) crystals and 2) broad energy range of imaging by employing a hybrid imaging combining Compton and coded aperture imaging. The imaging performance of the system was evaluated through experiments in various conditions with different gamma energies and source positions. The imaging system provides clear images of the source locations for gamma energies ranging from as low as 59.5 keV (241Am) to as high as 1,330 keV (60Co). The imaging resolution was within the range of 7.5–9.4°, depending on gamma energies, when a hybrid maximum likelihood estimation maximization (MLEM) algorithm was used. The developed system showed high sensitivity, as the 137Cs source at distance, incurring dose rate lower than background level (0.03 μSv/h above background dose rate), could be imaged in approximately 2 seconds. Even under lower dose rate condition (i.e., 0.003 μSv/h above background dose rate), the system was able to image the source within 30 seconds. The system developed in the present study broadens the applicable conditions of the gamma ray imaging in terms of gamma ray energy, dose rate, and imaging speed. The performance demonstrated here suggests a new perspective on radiation imaging in the nuclear decontamination and radioactive waste management field.
        2.
        2023.05 구독 인증기관·개인회원 무료
        Korea currently has two permanent shutdown Nuclear Power Plants (NPPs), and the decommissioning project is expected to begin soon, starting with the first commercial NPP. The decommissioning project will eventually be the disposal of radioactive waste in the final stage of the work, and in that respect, proper tracking and history management should be well established in the management of waste. This is in line with the guidelines that regulatory agencies should also properly manage radioactive waste. Therefore, this study intends to examine the factors that should be considered in terms of tracking and management of radioactive waste in decommissioning nuclear facilities. The starting and final point of tracking radioactive waste generated during decommissioning is the physical inventory of the current as-is state and the final container. In this respect, the tracking of waste starts from the beginning of the dismantling operation. Thus, at the stage of approval of the decommissioning work, it may begin with an ID scheme, such as the functional location in operation for the target System, Structure, and Components (SSCs). As the dismantling work progresses, SSCs will be classified by nature and radiological level, which will be placed in containers in small packaging units. At this time, the small package should be given an ID. After that, the dismantling work leads to the treatment of waste, which involves a series of operations such as cutting, decomposition, melting, and decontamination. Each step in which these tasks are performed will be placed in a container, and ID assignment is also required. Until now, the small packaging container is for transfer after each treatment, and it is placed in the storage container in the final stage, at which time the storage container also gives a unique ID. Considerations for follow-up management were reviewed assuming solid waste, which is the majority of dismantled radioactive waste considered in this study. The ID system should be prepared from the start of the dismantling work, ID generation of the small transporting container and ID generation of the final disposal container during the intermediate waste treatment process, and each ID generation of the previous stage should be linked to each generation stage. In addition, each ID must be generated, and the definition of the grant scheme and attributes is required.
        3.
        2022.10 구독 인증기관·개인회원 무료
        The decommissioning of nuclear power plant (NPP) consists of various activities, such system decontamination, take out of activated components, segmentation of the activated components, site remediation, etc. During various activities, the generation of radioactive wastes and radiation exposure to workers is expected. The systematic waste management during the activities is important to implement the decommissioning. The inefficient waste management usually bring significant delay in decommissioning process and results in increase of decommissioning cost. The radiation exposure management is also an important issue. It is generally accepted that the hot spot, generated from operation and decommissioning of NPP, is observed in many places within containment building. Although the health physicists measure the radiation in various points, the unintended hot spots are sometimes generated and observed. The effective radiation exposure management also requires the control of personnel and space during various activities. In this study, the radiation exposure and waste management experiences of Zion NPP is reviewed. The primary nuclides and radiation exposure during various activities are systematically studied to achieve the main objectives of this paper.
        4.
        2022.10 구독 인증기관·개인회원 무료
        Solid radioactive waste such as rubble, trimmed trees, contaminated soil, metal, concrete, used protective clothing, secondary waste, etc. are being generated due to the Fukushima nuclear power plant accident occurred on March 11, 2011. Solid radioactive waste inside of Fukushima NPP is estimated to be about 790,000 m3. The solid radioactive waste includes combustible rubble, trimmed trees, and used protective clothing, and is about 290,000 m3. These will be incinerated, reduced to about 20,000 m3 and stored in solid waste storage. The radioactive waste incinerator was completed in 2021. About 60,000 m3 of rubble containing metal and concrete with a surface dose rate of 1 mSv/h or higher will be stored without reduction treatment. Metal with a surface dose rate of 1 mSv/h or less are molten, and concrete undergoes a crushing process. About 60,000 m3 of contaminated soil (0.005 ~1 mSv/h) will be managed in solid waste storage without reduction treatment. The amount of secondary waste generated during the treatment of contaminated water is about 6,500 huge tanks, and additional research is being conducted on future treatment methods.
        5.
        2022.05 구독 인증기관·개인회원 무료
        The decommissioning of nuclear power plant (NPP) generates large amount of waste. Since the most of the concretes are slightly surface contaminated, the accurate characterization and regionspecific surface decontamination are important for the efficient waste management. After the effective surface decontamination and separation, most of the concrete waste from decommissioning of NPP can be classified as a clearance waste. Various surface characterization and decontamination technologies are suggested. The mechanical technologies are simple and offers direct application. The laser-based technologies offer efficient separation and surface contamination. The high price, however, hesitates the application of the process. The nitro-jet technology, which is based on the evaporation of liquid nitrogen, allows the effective decontamination. However, the high price and uncertainty of large are application hinders the practical application in NPP decommissioning. In this paper, various technologies for characterization, handling, treatment, etc., will be discussed. The advantages and disadvantages of the technologies will be discussed, in terms of practical applications.
        6.
        2022.05 구독 인증기관·개인회원 무료
        Korea Atomic Energy Research Institute (KAERI) has investigated Pyroprocessing technology in order to decrease the burden of disposal system and increase availability of useful radionuclides in the spent nuclear fuel (SNF) for future. The treatment and the disposal of SNF, however, are very sensitive issues socially. In addition, under the energy transition policy phasing out nuclear energy gradually there have been demands for alternatives so far. Thus various alternatives should need to be investigated in preparation for unexpected situations. This study has been conducted roughly in effectiveness point of view of alternative pre-managements for SNF, not pyroprocessing technology, in disposal system, consisting of three stages according to the degree of burden in disposal system. Stage I is the case for making safety increase with removing highly-mobile radionuclides from SNF. Stage II is the case for eliminating high-heat radionuclides additionally, alleviating thermal risk in the disposal system. And Stage III is the case for recovering Uranium in addition to Stage II. These options of pre-management are thought to be able to provide an intuitive strategy for effective diversification of the disposal system. Because several types of waste form from pre-management make it possible to develop the effective, newly-composed waste disposal system according to the properties of radionuclides. And the processability of SNF through pre-management might be combination with available core-drilling technology, being able to design various disposal system as well. Even though the whole, detailed unit processes have not designed yet, mass balance and distributions of radionuclides are performed under the appropriate assumption of engineering processes. As a first step the alternative approaches for SNF pre-management for disposal system might be expected to be widely used in implementing SNF management policy in the future.
        9.
        2021.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        In this study, basic strategies for the decommissioning and site remediation of the Fukushima Daiichi Nuclear Power Station (FDNPS) were investigated. Six scenarios were formulated based on two of the three decommissioning strategies of nuclear power plants defined by the International Atomic Energy Agency (IAEA): immediate dismantling and deferred dismantling. A multicriteria decision analysis was performed to analyze the preferences of the options from the viewpoints of the timeframe to complete decommissioning, the resulting waste, the site usability, and the availability of the radioactive waste disposal route. The same six scenarios were applied to both the FDNPS and the nuclear power plants that ceased operation after a normal plant life cycle for comparison. For the FDNPS, the decommissioning project involved fuel debris retrieval, dismantling, and site remediation. The analysis results suggest that the balance between the amount of waste and the time to achieve the end state may be one of the most critical factors to consider when planning the decommissioning and site remediation of the FDNPS.
        4,000원