Scheduling on the Pre-assembly Stage of Multiple Fabrication Machines
This paper analyses a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advan