An Assembly-Type Flowshop Scheduling Problem with Outsourcing Allowed
This paper considers an assembly-type flowshop scheduling problem in which each job is assembled with two types of components. One type of the components is outsourced with positive lead time but the other type is fabricated in-house at the first stage.