In this study, the risk factors which derive from the ground condition of typical construction sites are put forward. In order to prioritize the risk elements, the analytical method of AHP was used. The result of using a weighting factor for each risk analysis showed that if the constituency index is less than 0.1, then reliable results and priorities for each of the risk elements can be calculated using the AHP method. From now on, if the range of measured value can be established, the risk or safety value of concrete structures for power lines can be applicable.