논문 상세보기

전문 건설업종별 위험도 산정 방법에 관한 연구 KCI 등재

Formulation for Producing Risk Level of Each Construction Work

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/245802
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
대한안전경영과학회지 (Journal of Korea Safety Management & Science)
대한안전경영과학회 (Korea Safety Management & Science)
초록

Risk level for each construction work can be very important factors to establish advanced prevention measures. But it is important how to produce it. There are three different methods to set it up for construction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.

저자
  • 손기상 | Son, Ki-Sang
  • 갈원모 | Gal, Won-Mo
  • 송인용 | Song, In-Yong
  • 최재남 | Choi, Jea-Nam