Building a dam that is not considering the environmental impact and human social impact can cause the loss of entire ecospheres such as fragmentary green network, disturbance of plants ecosystem, the destruction of social and cultural indigenous resources, therefore, it can occur the environment change and distortion of ecosystem. The purpose of this study is that presenting the methods of ecosystem maintenance and ecosystem damage compensation about for environmentally direct impact i.e. the ecosystem change in the intended place for building a dam. According to the planning progress, the study was proceeded to planning site examine, assessment, conception plan. As the results of examine and assessment, it must be necessary to offered the maintenance and damage compensation if the site where include the 1st degree of biotope area, the 2nd degree of biotope and the 8th degree of green naturality area were damaged by being submerged and constructing road. In addition, according to the conception plan, we suggest the mitigation proposals such as plant communities transplant, planning of connecting green network against for influencing direct impact ecosystem that is destroying plant communities, damaging inhabitants, noise pollution, water pollution, etc.