Accuracy of dredging processes depends on the types of equipment used, the sediments encountered, whether the work to be performed is new or maintenance dredging, pre- and post-hydrographic surveying and so forth. Among those, position surveying accuracy which is directly determined by the control of the dredge's position and depth surveying accuracy being surveyed at the dredging point during dredging work are important factors. The purpose of this study is to develop 'Dredge Management System'for Grab dredge which is composed of 4 sub-system using LADGPS for dredge position determining system and dredging point determining system, tide gauge system and optical sensor for depth determining system and GIS and ENC for total management system. This system is installed on the grab dredge 'EUNJIN G-18'and applied to anchorage dredging work. at Pohang Harbor. The results revealed that this system is easy to operate, achieves good accuracy with only 45cm unevenness, reduces working period by 22 percent and saves cost 16.6 percent.