논문 상세보기

공공청사의 건축 구조체 공사비 산정모델 개발에 관한 예비적 연구

The Preliminary Study on Development of Structures Cost Estimating Model in Public Office Building Project

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/265967
구독 기관 인증 시 무료 이용이 가능합니다. 3,000원
리모델링 연구소 (A Journal of the Seismic Retrofitting & Remodeling Research Center)
단국대학교 리모델링연구소 (Seismic Retrofitting & Remodeling Research Center)
초록

When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

저자
  • 전재열(단국대학교 건축대학 건축공학과 정교수,공학박사) | Chun, Jae Youl
  • 이종식(단국대학교 대학원 건축공학과 박사과정) | Lee, Jong Sik
  • 조재호(단국대학교 대학원 건축공학과 박사과정) | Cho, Jae Ho
  • 김수민(단국대학교 대학원 건축공학과 석사과정) | Kim, Soo Min Corresponding author