논문 상세보기

무기체계 개발에서 RAMS 및 위험 관리를 통한 시험평가 프로세스의 개선에 관한 연구 KCI 등재

On Improving the Test and Evaluation Process by Incorporating the RAMS and Risk Management Processes

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/278317
구독 기관 인증 시 무료 이용이 가능합니다. 4,300원
대한안전경영과학회지 (Journal of Korea Safety Management & Science)
대한안전경영과학회 (Korea Safety Management & Science)
초록

As weapon systems become complex in terms of the scale and functionality, the required time to complete the test and evaluation (T&E) process is inevitably getting longer. However, nowadays the reduction of T&E period becomes one of the core targets in the weapon systems acquisition programs. This is because the reduced time for T&E process can yield the reduction of defense budget and also faster deployment of the weapon systems, thereby having a competitive edge over rival countries. On the other hand, in weapon systems development the management of reliability, availability, maintainability and safety (RAMS), and risk is considered important to keep competitiveness and thus has been carried out separately. Thus, the objective of this paper is to study on improving the T&E process by integrating the RAMS and risk management process in it. To do so, the related processes are analyzed and modeled first. Then an integrated process model is developed. The resulting model is equipped with the traceability among the data and interfaces that are generated from the T&E and RAMS/risk processes. As a case study, the model developed is applied in tanks development. The effective use of the traceability is expected to reduce the time and cost required to complete T&E process.

저자
  • 신영돈(삼성탈레스) | Shin, Young-Don
  • 심상현( 아주대학교 시스템공학과) | 심상현
  • 이재천( 아주대학교 시스템공학과) | 이재천