The national Logistics Information system has been rapidly developed on account of the dramatic improvements in the military’s logistics support system and supply support system, making a transition from manual work system to computerized work system. Supply level, however, does not reflect these changes in the overall logistics environment and still retains the state it was in the 1970s. This research uses the accumulated data from the equipment․maintenance information system developed in the year 2009 to analyze RWT( Requisition Wait Time) and CWT (Customer Wait Time). The analysis estimated the realistic transportation and ordering time and led to the conclusion that the differentiated ASL operation system that considers demand level should be adopted instead of the uniform ASL employment system.