논문 상세보기

호남고속철도 테스트베드 구간 시설물 계측관리를 위한 통합상황실 구축에 관한 연구

A study on the construction of integrated monitoring center for measurement management of Honam high-speed railroad infrastructure

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/287424
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

To manage the data measured from Honam high-speed railroad(HSR) infrastructure(environmental noise reduction structures, track structures, catenary system), we are trying to establish an integrated database through analysis of the developed infrastructure technologies and standards, construction of prototypes on the fields and evaluation of infrastructure performance according to the increment of train speed. In this paper, integrated monitoring center for management of measured data is suggested.

저자
  • 박영곤(한국철도기술연구원 첨단인프라연구팀) | Park, Young Kon 교신저자
  • 엄기영(한국철도기술연구원 첨단인프라연구팀) | Eum, Ki Young
  • 윤희택(한국철도기술연구원 첨단인프라연구팀) | Yoon, Hee Taek
  • 황경훈((주) 승화프리텍 기술연구소) | Hwang, Kyung Hun