Not long ago, most escavation methods for tunnel or underground structure are selected by NATM method. But these days such as Shield TBM or Semi-shield TBM are applicated for structure length and ground condition. On the other hand almost TBM technology is depend on foreign country, so this technology is much a work in process. In this study, information factors during TBM tunnel construction was suggested by analysis in-situ data