The construction of underground rail crossing is effect on railroad infra-structure and rail safety. So various methods have been suggested to construct through the infra-structure on the railroad. This paper treats the results of studies for safety of temporary bridge using a commercial FEM program, RM which is operated based on data measured on a sites. Also it was carried out optimal section considering characteristic of dynamic which reflects actual load for speed cases.