Test-bed was constructed in Honam High-speed railway due to evaluate the suitable infrastructure for operation of 400km/h level speed. To evaluate performance of roadbed in test-bed, several sensors installed in the standard roadbed, soft ground, transition zone as bridge and earthwork. In contrast to existing long-term monitoring, system developed was designed and builted on site to log-time operation automatically. Therefore, the measured data collected monitoring system and analysis results can be databased continuously from construction to operation of railway for study design criteria about long-term behavior of roadbed.