In this Study, the dynamic movement of concrete bounded by steel-band on reinforced-concrete column the external sides of which were reinforced by steel band has been evaluated as a case of post-tension engineering. Total five different experimental objectives were made and the rate of deformation of each binding concrete depending on different binding power forced to steel-band and locations of primary roots and different interval distances between reinforcing materials been checked.