Structure analysis and field instrumentation were carried out to understand the cause of crack taken place on a cover plate of a lower flange in plate-girder bridge.
A cause of the crack turn out to be fatigue stress so that the bridge is in need of repair and reinforcement such as surface grinding, rewelding after gouging and reinforcement for a part of welding on a cover plate.