Reduction of Construction Period by Applying Dome Liner Plate Module
Construction period is one of the most important factors which influence on cost and quality in nuclear power plant construction. As part of continued efforts for the competent reactor type, a dome liner plate module in the reactor containment building is developed to minimize the construction period. This study referred to knowledge and experiences from APR+(Advanced Power Reactor Plus) technical development. The proposed method can be applied to the APR+ in the near future.