논문 상세보기

사업기획단계에서의 현수교의 물량추정을 위한 모델연구 KCI 등재

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/312513
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
복합신소재구조학회 논문집 (Journal of the Korean Society for Advanced Composite Structures)
한국복합신소재구조학회 (Korean Society for Advanced Composite Structures)
초록

Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we’d analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

목차
1. 서 론
2. 주요 부재별 단면설정
3. 시스템 인터페이스 설계 및 구현
4. 결 론
References
저자
  • 박원태(공주대학교 건설환경공학부 교수) | Park, Weon-Tae
  • 천경식(포스코건설 R&D센터 책임연구원) | Kyoung-Sik Chun Corresponding author