한국구조물진단유지관리공학회(The Korea Institute For Structural Maintenance and Inspection)
초록
A new high-rise building in downtown before Underground excavation work, These steps are conducted such as RMR analysis, Schmidt Hammer Test, and Rock Mass Classification by Breakability, After that rock digging work will begin.