한국구조물진단유지관리공학회(The Korea Institute For Structural Maintenance and Inspection)
초록
Network design of the Reservoir Failure Forecasting System are proposed to using LPWA network in order to actively respond to the power problem, breaking communication wire and cost reduction of management system.