콘크리트 포장을 덧씌운 비절삭과 절삭 아스팔트 포장의 공용성 비교 KCI 등재

Comparison of Performance of Non-Mill-and-Overlay and Mill-and-Overlay on Concrete Pavement

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/338461
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국도로학회논문집 (International journal of highway engineering)
한국도로학회 (Korean Society of Road Engineers)
초록

PURPOSES : In this study, the pavement condition of non-mill-and-overlay and mill-and-overlay on deteriorated concrete pavement was compared. In addition, the suitable time to perform the initial overlay was investigated.METHODS : The condition of the pavement sections that were not additionally overlaid on non-mill-and-overlay or mill-and-overlay on deteriorated concrete pavements was investigated according to overlay pavement age. The condition of non-mill-and-overlay and mill-andoverlay sections of expressway route 25, which has more information on overlay history than other routes, was compared according to the number of times of overlay. The relation between the concrete pavement condition just before the overlay and the number of times of overlay was investigated for the non-mill-and-overlay and mill-and-overlay sections for which the first overlay was performed in the same year.RESULTS: The pavement condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections, showing higher Highway Pavement Condition Index(HPCI) regardless of overlay pavement age. The number of reflection crackings of the non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. As a result of observing the cores obtained from the overlay sections, the proportion of the deteriorated non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. The SD measured just before the overlay on the concrete pavement for which additional overlay was not performed was smaller than that for which additional overlay was performed regardless of the milling of the concrete slab surface. The HPCI of the concrete pavement for which overlay was performed just once was higher than that for which overlay was performed more than one time.CONCLUSIONS : Accordingly, it was concluded that the condition of the non-mill-and-overlay sections was better than that of the milland-overlay sections. In addition, the better the condition of concrete pavement just before the initial overlay, the longer the duration of the overlay effect.

저자
  • 최미란(정회원·인하대학교 토목공학과 석사·한국도로공사 광주지사 과장) | Mi Ran Choi
  • 박해원(학생회원·인하대학교 토목공학과 석사과정) | Hae Won Park
  • 정진훈(정회원·인하대학교 사회인프라공학과 교수·교신저자) | Jin Hoon Jeong