작업부하의 불균형에 따른 Job Shop 작업계획

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/353995
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

This study presents the new dispatching rules of job shop scheduling with unbalanced machine workloads to decrease mean flow time and mean tardiness. The proposed dispatching rules consider the information related to work remaining, modified job due dates, modified operation due dates and machine workload. The performance of the new dispatching rules is compared and analyzed with the existing rules through the computer simulation at different levels of workload imbalanced. The results can be useful to the researchers and practitioners of job shop scheduling with unbalanced machine workloads.