Concrete Dam Drain Hole 1 Year Temperature Monitoring Data
This study sought to find a new diagnostic method. The drain hole temperature and the upstream water temperature change were measured for 1 year. The purpose of this study was to analyze the correlation between the temperature of the drain hole and the upstream temperature.