The purpose of this research was to investigate applicative possibility of field. Pilot-scale experiments were conducted, at outdoor temperature, HRT 10hour, IR(Internal Recycle) 150% and used 2.8㎥ Reactor. External carbon source was varied 80 to 120 mg/L. When External carbon source and Alkalinity were injected to the B3 pilot plant, the removal efficiencies of COD and BOD were not decreased. Nitrification rate were 5.95, 5.40, 4.08 mgNH4+-N/gSS/d during operation periods and denitrification rate was 3.12mgNO3--N/gSS/d. When we surveyed the relationship between loading rate of nitrogen and nitrogen removal quantity, this data was 0.949, B3 process will be possible application process of field.