The TRM method applied in this study is a method aiming at long span and low girder hight of the temporary bridge. When the preload is introduced to the girder member and the preload is removed after by welding the stiffener, a prestress is introduced through the stiffener to increase the load capacity of the member. Therefore, in this study, the structural performance improvement through the application of the TRM method was verified experimentally by the bending tests of the specimens with and without the TRM method.