초록

The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle’s top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system’s adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.

목차
1. 서 론
2. 모델화 범위 및 방법
    2.1 연구의 범위
    2.2 개발방법 및 절차
    2.3 시뮬레이션 분석을 통한 기대효과
3. 모델화 대상 및 시뮬레이션 조건
    3.1 공정흐름의 조건
    3.2 운전조건
    3.3 실험조건
4. 실험 결과 및 분석
    4.1 시나리오 분석
    4.2 공정분석
5. 결 론
References
저자
  • Hoyeon Chung(전주대학교 산업공학과/주식회사 타이탄) | 정호연 Corresponding Author