논문 상세보기

Risk Management for R&D Projects in the Military Aircraft Systems KCI 등재

군용항공기 연구개발 사업의 리스크 관리

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/411689
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

목차
1. 서 론
2. 관련 문헌 연구
    2.1 항공무기 체계 개발 요소
    2.2 항공기 감항 인증
    2.3 연구개발 리스크 관리
3. 연구 설계
    3.1 연구 절차 설정
4. 결과 분석
    4.1 AHP 분석 결과
    4.2 성능 관련 사고 사례조사
    4.3 사례 조사 분석 및 리스크 식별
5. 결 론
References
저자
  • Sung Hun Kim(방위사업청 국제협력관실) | 김성훈
  • Hyun Cheol Lee(한국항공대학교 경영학부) | 이현철 Corresponding Author