논문 상세보기

편도 2차로 고속도로 장기공사구간의 용량 및 정체 추정 KCI 등재

Estimation of Capacity and Delay in Long-Term Two-lane Freeway Work Zones

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/414884
구독 기관 인증 시 무료 이용이 가능합니다. 4,200원
한국도로학회논문집 (International journal of highway engineering)
한국도로학회 (Korean Society of Road Engineers)
초록

PURPOSES : The purpose of this study is to perform traffic flow characteristics analysis for each point of the long-term work zones and to propose an estimated capacity method to support the establishment of traffic flow management strategies for the long-term work zones.
METHODS : The study explained the difference in traffic flow characteristics between the short-term and the long-term work zones, and estimated the capacity of the long-term work zones. The analysis data were collected from five points of long-term work zones of the twolane highway. And VDS and DSRC data were applied to validate data.
RESULTS : The characteristics of traffic flow at each measurement point in the long-term work zones showed some differences, among which the capacity was estimated as the starting point to be 1,200 pcphpl and the ending point, 1,400 pcphpl. The delay length was estimated by applying the queuing theory based on the capacity of the start point where the bottleneck starts. As a result of verifying the congestion length based on space diagram map analysis, it was determined that the capacity calculation value and estimation methodology presented in this study were appropriate.
CONCLUSIONS : The long-term work zones are mixed with different characteristics of roads, so as the capacity values depending on the analysis location. Therefore, it is necessary to select analysis points and methodologies for estimating capacity and delay depending on the purpose of the analysis, such as estimating the maximum queue length or analyzing the maximum travel time. Through this study, it is expected that by providing accurate information on congestion in advance, road users can detour to other roads, and construction officials can adjust the construction plan to minimize congestion in the construction section.

목차
ABSTRACT
1. 서론
2. 선행연구
    2.1. 공사구간 정의 및 종류
    2.2. 용량 산정 방법론
    2.3. 정체 추정 방법론
    2.4. 차별성
3. 자료수집 및 가공
    3.1. 데이터 수집
    3.2. 기초데이터 분석
4. 용량 및 정체 추정
    4.1. 지점별 용량 산정
    4.2. 정체 추정을 통한 용량 검증
5. 결론
REFERENCES
저자
  • 김도훈(한국교통안전공단 선임연구원) | Kim Do hoon
  • 박용진(계명대학교 교통공학전공 교수) | Park Yong jin Corresponding author
  • 권오훈(계명대학교 교통공학전공 부교수) | Kwon Oh Hoon
  • 박신형(서울시립대학교 교통공학과 부교수) | Park Shin Hyoung