논문 상세보기

Preventive Policy With Minor Failure Under Age and Periodic Replacement KCI 등재

경미한 고장을 수반하는 시스템에 대한 노화 및 예방적 교체 정책

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/416804
구독 기관 인증 시 무료 이용이 가능합니다. 4,300원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

The purpose of this study was to propose useful suggestion by analyzing preventive replacement policy under which there are minor and major failure. Here, major failure is defined as the failure of system which causes the system to stop working, however, the minor failure is defined as the situation in which the system is working but there exists inconvenience for the user to experience the degradation of performance. For this purpose, we formulated an expected cost rate as a function of periodic replacement time and the number of system update cycles. Then, using the probability and differentiation theory, we analyzed the cost rate function to find the optimal points for periodic replacement time and the number of system update cycles. Also, we present a numerical example to show how to apply our model to the real and practical situation in which even under the minor failure, the user of system is not willing to replace or repair the system immediately, instead he/she is willing to defer the repair or replacement until the periodic or preventive replacement time. Optimal preventive replacement timing using two variables, which are periodic replacement time and the number of system update cycles, is provided and the effects of those variables on the cost are analyzed.

목차
1. 서 론
2. 모 형
3. 수치 예제
4. 결 론
Acknowledgement
References
Appendix
저자
  • Jinpyo Lee(홍익대학교 경영대학 경영학과) | 이진표 Corresponding author