In the general process of design for aerobic digestion, the design for field plant of which inflow pattern is continuous inflow is performed using the results from lab scale batch reactor. However, the recent researchers reported that the general designs were performed as over-estimated, Therefore, in this study, laboratory batch experiments were carried out at $20^{\circ}C$ and pH 7.5 on the aerobic digestion of waste activated sludge at different solid levels. This treatise could consider the negligence about effective digestion periods the usage of VSS as solid concentration, and the effect of initial solid concentration of solid degration rate coefficient($k_d$) as reasons of the overestimated design, and showed the scheme of how to design for aerobic digestion from batch experiment.