A Study on the Loss Cost of Delayed Weaponization of Weapons System KCI 등재

무기체계 전력화 지연이 미치는 손실비용에 대한 연구

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/428985
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

The Korean military has sought to build an all-round military force against the national and international security environment and future asymmetric threats as well as the military threats it faces. However, while raising the need for timely electrification, there are few cases of quantitatively evaluating the loss when electrification is delayed, making it difficult for our military to provide a logical basis to support the importance of the electrification period. Therefore, through this study, we tried to analyze the index of loss cost that can support the need for timely electrification with logical and quantitative data and present it as a logical basis. To this end, the loss cost was calculated in terms of combat efficiency, equipment utilization rate, and maintenance requirements, which can be quantitatively calculated based on “combat readiness,” a general impact on the military in case of delayed timely electrification.

목차
1. 서 론
2. 전력화시기 결정시 고려사항
3. 전력화시기 지연 요인 및 사례
4. 전력화시기 지연에 따른 손실비용 평가요소정립
    4.1 전투효율 저하
    4.2 장비가동률 저하
    4.3 정비소요 증가
5. 전력화시기 지연에 따른 손실비용의평가사례 분석
    5.1 전투효율 저하에 따른 손실비용
    5.2 장비가동률 저하에 따른 손실비용
    5.3 정비소요 증가에 따른 손실비용
6. 결 론
References