Untreated waste is temporarily stored on the site of the nuclear power plant. In some nuclear power plants, saturation period of temporary storage waste is less than 10 years away. As untreated waste continues to be generated in nuclear power plants, it could also affect management of operations. Accordingly, CRI is developing the 3.5 generation plasma torch melting facility for waste treatment. The 3.5th generation plasma torch melting facility consists of melter, plasma torch, waste supply device, exhaust gas treatment facility, power supply, etc. Melter is composed of melting chamber for melting control and pyrolysis chamber for waste pretreatment, and dam-type discharge device is adopted to overflow the melt. Plasma torch is hollow type with reversed discharge, has a rating of megawatt class, and has two gas supply lines. It can be used in transfer mode, non-transfer mode and mixed mode. There are three types of device for waste supply. The first is a drum pusher for injecting 200 L drums, the second is a screw-type waste supply and hopper for injecting solid waste, and the third is a nozzle-type waste supply device for injecting liquid waste. Exhaust gas treatment facility was equipped with post combustion chamber, off-gas cooler, high-temperature filter, HEPA filter, reheater, scrubber, ID fan and etc. Power supply of plasma torch operation is designed with a capacity of 1.5 megawatt (Maximum) and consists of channels A and B. Transfer mode, non-transfer mode and mixing mode of plasma torch may be selected through the control of PLC. This paper introduces the composition and function of the 3.5th generation plasma torch melting facility of CRI. In order to solve the problems arising through the operation of the 3rd generation plasma torch melting facility, an optimization plan is applied.