A Study on the Operation of Scaling Factors for Radioactive Waste During Permanent Shutdown Prior to Decommissioning of Nuclear Power Plants

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/430990
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

Domestic nuclear power plants developed the scaling factors for the radioactive waste generated from 2004 to 2008 for the first time. Afterwards, the effectiveness of continuous application of the scaling factors have been evaluated for newly generated radioactive waste over the past two years. It was confirmed that most of the initially developed scale factors were effective within a factor of 10 principle, which is an acceptable range. The scaling factors were updated using the analysis data base from 2004 to 2016. A scaling factor refers to the calculated abundance ratio between Key (Easy-to- Measure) and DTM (Difficult-to-Measure) nuclide at the time of generation of radioactive waste based on the source term in the reactor of an operating nuclear power plant. The effectiveness of continuous application of scaling factors can be evaluated at regular intervals regardless of operation status or when there are events that change scaling factors during nuclear power plant operation, such as zinc injection, large-scale facility replacement, and long-term shutdown etc. Even in the case of a permanently shut down nuclear power plant in which fuel is withdrawn from the reactor and generation of new nuclides by nuclear fission and radiation has stopped, periodic verification is conducted to confirm whether the scaling factor developed before permanent shutdown can be effectively applied to the radioactive waste generated after permanent shutdown. However, depending on the nuclear power plant decommissioning strategy or conditions, the period of permanent shutdown prior to decommissioning can be very long, so preparations are needed to ensure the appropriateness of scaling factor operation. In the case of domestic nuclear power plants, Kori Unit 1, a light water reactor, was permanently shut down in June 2017, and as a heavy water reactor nuclear power plant, the permanent shutdown of Wolseong Unit 1 was finally decided in December 2019 after twists and turns including large-scale facility replacement and long-term shutdown. In this paper, we have predicted when the scaling factors will change significantly due to radioactive decay and the difference in halflife between the Key and DTM nuclides over time after permanent shutdown. We also have tried to find appropriate countermeasures for the operation of scaling factors during permanent shutdown period, such as updating scaling factors or applying correction factors.

저자
  • Hang-Rae Cho(Korea Hydro & Nuclear Power (KHNP)) Corresponding author
  • Ji-Eun Park(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Sang-June Park(Korea Hydro & Nuclear Power (KHNP))
  • Jun-Gi Yeom(Korea Hydro & Nuclear Power (KHNP))