선행제약을 고려한 권역단위 공병장애물 설치경로 최적화 모형
This paper presents a path planning optimization model for the engineering units to install obstacles in the shortest time during wartime. In a rapidly changing battlefield environment, engineering units operate various engineering obstacles to fix, bypass, and delay enemy maneuvers, and the success of the operation lies in efficiently planning the obstacle installation path in the shortest time. Existing studies have not reflected the existence of obstacle material storage that should be visited precedence before installing obstacles, and there is a problem that does not fit the reality of the operation in which the installation is continuously carried out on a regional basis. By presenting a Mixed Integrer Programming optimization model reflecting various constraints suitable for the battlefield environment, this study attempted to promote the efficient mission performance of the engineering unit during wartime.