This study of small & Medium-Sized construction sites construction disaster prevention technology conduction-site visits from the map results report by the inspector on-site advice and technical guidance for the analysis of deficiencies and potential construction of disaster revealed the potential factors causing an accident as follows. As a results, Should not be a once a month visits. Therefore should be changed at least twice a month to help prevent accidents of this system is to be judged.