검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2016.04 서비스 종료(열람 제한)
        Damage by ship collision is related to the frequency of loads due to impact, and ships accordingly must be designed to satisfy related requirements. Another important aspect is the management of collision risks during the service period. This study performed an interim assessment of Incheon Bridge focusing on the risk of ship collision, and proposed solutions to the identified problems. It is necessary to conduct further research on collision risk management and promptly carry out interim assessments of other marine bridges.
        2.
        2007.06 KCI 등재 서비스 종료(열람 제한)
        In this study, We developed an evaluation system for the interim check of Integrated Rural Village Development Project and analyzed its applicability to an actual evaluation process through a pilot evaluation on regions selected. The evaluation system consists of documentary assessments(30%) and field inspections(70%). The documentary assessments are quantitative assessments on check-lists reports by self-evaluation prepared by local governments. The field inspections are qualitative assessments by evaluation teams. Sixteen evaluation indices were developed for documentary assessments and seven criteria were designed for field inspections. For a pilot evaluation, one region in each province excluding Jeju Do, eight regions was selected and the field inspections due to circumstances was proceeded in two regions. The results of documentary assessments indicate that most of regions are evaluated low in project performance attributable to the delay in security for sites. In the field inspections, it appears that most of the regions evaluated high at the documentary assessments got a high point from them. They also show that coordination of action plans, rather than quantitative achievements, is a base determining success of the projects.