Recently expanding market for largely scale construction projects, cost management of construction project have been increasingly recognized as an important factor responsible for the project success. But public organizations have been continuously operating the same methods as before in cost estimating, so it raise an issue of reliability for estimated cost. Therefore, this study present a highly reliable model that makes preliminary estimates based quantity data in early design stage. it enables engineers to efficiently manage total cost of project as well as partial cost estimating. This study develop a model of database that is created with historical data conducted by government offices. The model proposed can estirnate a cost for RC Structure in schematic design stage, and it is applied to CBR+GA logics to explore best similar cases. In case of estimating methods used to previous research, it is based on actual cost data. Due to the cost estimating compensated by inflation rate vary in market economic conditions, it will follow as an inevitable consequence of reliability problem. It needs to find better way to ensure accuracy through quantity database. Also, This study has been conducted in attempts to verify the reliability of preliminary estirnation. It is checked for the feasibility of presented model with P-National Tax Service Project aside from the database.
BIM은 지금까지 건설업무에 적용하는데 많은 시행착오를 겪어 왔다. BIM인 이슈화된지 10여년이 지났지만 활성화가 안 되고 있는게 현실이다. 본 연구는 철근콘크리트공사에 BIM적용을 제안하고자 한다. 철근콘크리트 공사는 건축공사비 중 가장 큰 비중을 차지하는 반면에 재료의 수가 적고 한정적이다. 또한 구조물 공사에 대한 모델링을 하여야 다른 모델링을 할 수 있으므로 철근콘크리트공사의 3D모델은 모든 3D모델링의 바탕이 되기 때문에 3D 모델링을 가장 처음 하여야 한다. 철근 콘크리트공사에 대한 수량산출 프로그램개발 및 사례를 통하 여 BIM기반의 철근콘크리트 공사에 지식기반의 수식DB를 적용하여 시공단계까지 활용할 수 있는 BIM기반의 산출정보를 구축하였고, 적용성을 검증하였다. 이로써 BIM기반의 타 공종도 구현 가능성을 제시함으로써 정보화, 지능화 시대에 건설산업도 BIM기반의 활성화가 가능하 다는 것을 확인하였다.