This study was carried out to evaluate the Life Cycle Cost(LCC) of four types of BIPV(Building Integrated Photovoltaic) systems -Glass plus Granite, Crystalline BIPV, Crystalline BIPV + Glass plus Granite and See through Amorphous BIPV -which were vertically installed to generate the same capacity(2kW) and the same area. Initial investment costs, cost savings and maintenance costs had been predicted during the period of analysing the LCC of four types of BIPV(Building Integrated Photovoltaic) systems installed for the purpose of evaluating the LCC. In case of cost savings, it had been analyzed by measuring the amount of electric power generated, reduction in lighting load and heat & cooling loads through simulation. From this analysis, it was predicted that the See-through amorphous BIPV offering cost saving advantages demonstrated the economical efficiency similar to the Glass plus Granite when it is backed by more than 20 years of durability.