검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this paper is to give information on e-CPC implementation in the manufacturing industry by studying and analyzing a small and medium sized manufacturing company. After analyzing Various factors on J’s e-CPC implementation such as environmen
        4,000원
        2.
        2006.09 구독 인증기관 무료, 개인회원 유료
        Numerous studies have suggested that the traditional project management tools do not adequately support the coordination efforts required to successfully deliver projects. because they were not developed to control uncertainty which is one of the characteristic of construction project. In traditional construction process control, supervisor usually measures the quantity of production for the project schedule. Flow production has suggested that better productivity, like that labor and cost performance can be achieved by reducing work flows variability. This research has suggested that 1) the circular concept of productivity with work flows variation. 2) the indicators that quantitatively measure work flows variation using productivity data which is obtained from the document of construction field. 3) measurement of productivity-based work flows variation for analyzing correlation with variation of productivity and verifies.
        4,000원