검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2007.11 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper describes on the real-time monitoring of net setting and hauling process for fishing operations of Danish seine vessels in the southern waters of Korea as an application of a PC based ECDIS system. Tracking of fishing process was performed for the large scale Danish seine vessel of G/T 90 and 350 PS class using the fishing gear which the length of net, ground rope, head rope and sweep line including warp in both sides were 86m, 104m, 118m and 3,200m, respectively. Tracking information for net setting and hauling process was continuously recorded for 23 fishing operations performed on November and December, 2003. All measurement data, such as trawl position, heading, towing course and past track which was individually time stamped during data acquisition, was processed in real time on the ECDIS and displayed simultaneously on the ENC chart. The results indicated that after the separation of a marker buoy from Danish seiner, the averaged running speed of vessel and the averaged setting period while shooting the seine on the course of diamond shape to surround the fish school in the 23 fishing operations were 8.3 knots and 13.1 minutes, respectively. And with the maker buoy taken on board, the averaged running speed of vessel and the averaged towing period while closing the seine on the straight route was 1.0 knots and 47.0 minutes, respectively. After the closing stage of hand rope, the hand rope was towed by the averaged speed of 2.2 knots during the 13.0 minutes. The average area for route of diamond shape swept by sweep lines of the seine in 23 fishing grounds was 709,951.6m2. Further investigation is also planed to provide more quantitative tracking information and to achieve more effective surveillance and control of Danish seine vessels in EEZ fishing grounds.
        4,000원